PHILIPPINES · SITE-LED SYSTEMS ENGINEERING

Security, access and energy systems—made to work on site.

From site assessment and system design to BOQ, deployment, testing and handover.

CCTV · Access Control · Security Screening · Parking · Solar · Structured Cabling

Engineering team reviewing a system plan at a Philippine commercial site
01One project line—from survey to handover
Site AssessmentSystem DesignBOQ & ProposalDeploymentTesting & Handover

01 / CAPABILITIES

More than equipment.

We connect the site, system, materials and delivery responsibility—so the quotation can become a working project.

01

Video Surveillance

Camera placement, field-of-view checks, bandwidth, retention, storage and platform planning.

02

Access Control

Doors, credentials, visitors, turnstiles, attendance and selected lift interfaces.

03

Security Screening

X-ray baggage scanners, metal detection, queue planning, workflow and readiness support.

04

Parking Systems

Philippine plate recognition, barriers, visitor vehicles, lanes, safety and night conditions.

05

Solar Energy

Site assessment, load basis, capacity planning, equipment coordination and commissioning.

06

Structured Cabling

Copper, fibre, PoE, racks, UPS, cable routes, labelling and test documentation.

Integrated CCTV, access control and command centre environment
Integrated securitySystems designed together, not in isolation.
Baggage X-ray and walk-through metal detector screening lane
Security screeningEquipment, operator flow and site readiness.
Parking barrier and Philippine licence plate recognition at an office entrance
Philippine parking systemsLocal plates, lane safety and visitor control.

02 / INDUSTRIES

Built around the way your facility operates.

The same camera or access reader behaves differently in a hospital, hotel, warehouse or campus. We begin with the people, risks and operating flow.

01

Hospitals & Healthcare

Patient and visitor flow, restricted clinical areas, pharmacy and asset protection, emergency access and continuous operation.

02

Commercial Buildings

Tenant and visitor access, lobbies, lifts, loading areas, car parks and central monitoring across daily operations.

03

Hotels & Residential

Guest and resident experience, service entrances, amenities, parking, deliveries and staff-controlled areas.

04

Industrial & Logistics

Perimeters, gates, warehouses, loading bays, worker access, vehicle movement and evidence for incident review.

05

Schools & Campuses

Students, staff and visitors across entrances, open grounds, classrooms, shared facilities and emergency procedures.

Integrated systems serving a Philippine facility
One site, connected responsibilities.Security, access, network, power and operations are reviewed together.

03 / WHAT WE DELIVER

Clear outputs at every project stage.

Each stage should leave something the client can review, approve, test or operate—not just a conversation.

01

Site Survey & Risk Review

Existing conditions, operating flow, blind spots, access points, routes, power, network and implementation constraints.

02

Drawings & System Design

Device locations, coverage objectives, door logic, lane layouts, cable routes, rack and platform architecture.

03

BOQ & Product Selection

Transparent quantities, model basis, accessories, licenses, installation materials, assumptions and exclusions.

04

Installation & Integration

Approved drawings, coordinated installation, labelling, configuration and interfaces between selected systems.

05

Testing & Handover

Functional tests, acceptance records, user training, as-built information and issue closure before turnover.

06

Maintenance Planning

Warranty boundary, preventive checks, backup strategy, spare-parts basis and response expectations.

SYSTEM VIEW

How an integrated site works.

Devices only become a system when connectivity, power, platforms, storage and operating rules agree.

01

Field devices

CCTV cameras · card readers · locks · screening equipment · parking gates · solar monitoring

02

Network & power

PoE switching · fibre backbone · racks · UPS · surge protection · resilient power

03

Control & records

VMS · access platform · NVR and storage · permissions · alarms · reports and audit logs

Final architecture is defined after site assessment and approval of operational requirements.

DOCUMENTED DELIVERY

From drawing to handover.

A project should remain understandable after the installers leave. We build a record of what was designed, supplied, installed and tested.

01

Marked-up Plans

Locations, routes, device IDs and coordination notes.

02

Camera & Door Schedules

Purpose, model, lens, reader, lock and interface information.

03

BOQ & Assumptions

Quantities, inclusions, exclusions and pricing basis.

04

Test & Handover Records

Results, punch-list closure, training and turnover records.

04 / DELIVERY

One accountable project line.

A floor plan is a starting point. Site evidence, operating goals and acceptance criteria turn it into a deliverable system.

01

Discover

Clarify the problem, site, budget basis and target outcome.

02

Assess

Verify locations, routes, power, network, workflow and constraints.

03

Design & BOQ

Develop layouts, calculations, quantities, assumptions and criteria.

04

Deploy & Test

Coordinate approved resources under drawing, safety and quality controls.

05

Handover & Maintain

Train users, deliver records and establish the service boundary.

05 / ABOUT MOKOM

An engineering team that carries the plan into the field.

MOKOM coordinates discovery, site assessment, design, product sourcing, project delivery, testing, training and maintenance planning for organizations in the Philippines.

Design before equipmentControlled product selectionDocumented deliveryLifecycle focus
MOKOM

SEE CLEARLY.
CONTROL ACCESS.
SCREEN SMARTER.

MOKOM engineering and coordination team reviewing drawings at a Philippine project site

06 / CAREERS

Build systems that have to work in the real world.

We value people who can read drawings, ask the right site questions, coordinate clearly and solve problems where the project actually happens.

  • ELV Solution Design EngineerAutoCAD · Site Survey · BOQ · English

    What you will doSurvey sites, develop layouts and BOQs, and coordinate requirements with clients and suppliers.

  • ELV Field TechnicianInstallation · Testing · Troubleshooting

    What you will doInstall, label, configure, test and troubleshoot systems safely at active project sites.

  • Pre-sales SolutionsRequirements · Product Review · Proposal

    What you will doTurn client requirements into fit-for-purpose selections, proposals and technical responses.

  • Site & Project CoordinationSchedule · Documentation · Handover

    What you will doCoordinate schedules, resources, records, stakeholders, testing and handover activities.

Apply online and upload your résumé ↗

07 / APPLY

Bring your site experience to MOKOM.

Tell us what you can do and where you want to grow. Your application goes directly to our recruitment inbox.

Before you uploadPDF, DOC or DOCX · maximum 5 MB. Remove confidential client drawings and passwords from sample work.
PDF, DOC or DOCX · maximum 5 MB

08 / PRACTICAL QUESTIONS

Straight answers before the first meeting.

These are the questions we hear most when a project is still taking shape.

Do you supply equipment only?

Yes. We can supply against an approved specification. Design review, installation, testing and documentation can also be included when turnkey delivery is required.

Can you work from existing floor plans?

Yes. Architectural and reflected ceiling plans are useful starting points, but critical locations, routes, power, network and operating assumptions still need site verification.

Do you support projects outside Metro Manila?

Yes. We can plan work across Luzon and selected areas in the Visayas and Mindanao, with travel, logistics and local coordination defined in the proposal.

What does a site assessment include?

We review the operating goal, access points, mounting conditions, cable paths, network and power availability, existing systems, risks and constraints that affect the design.

Can the system be phased by budget?

Yes. We can define a foundation architecture and prioritize critical areas first, while protecting compatibility for later phases.

09 / START A PROJECT

Tell us what is happening on site.

Have a floor plan? Send the basics first. No drawing yet? We can begin with a structured site assessment.

Project type *